Novarly ParcelRenewable sites

Renewable sitesIwade Solar Farm

Iwade Solar Farm

Iwade Solar Farm is an operational 1.7 MW solar farm in Swale, generating since 19 March 2015. Planning permission was granted on 11 July 2013, 6 months after submission. Operator of record: FH Dean Ltd.

1.7 MW
Capacity
as recorded in REPD
Operational
Status
since 19 March 2015
Solar Photovoltaics
Technology
FH Dean Ltd
Swale
Authority
England

Planning and build timeline

Application submitted17 January 2013
Permission granted11 July 2013
6 months after submission
Operational19 March 2015
20 months after consent

Screening a site of your own?

RedlineUK · £39

Swale approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Iwade Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swale’s record on solar

Swale has decided 26 solar farms and approved 96%, taking a median of 2.5 months. See every solar farm decision in Swale

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
11.32.6 km
Solar Photovoltaics · Operational
103.1 km
Battery · Operational
49.96.2 km
Solar Photovoltaics · Operational
26.4 km
EfW Incineration · Operational
49.97.3 km
Biomass (dedicated) · Operational
257.5 km
Battery · Under Construction
208.3 km
Solar Photovoltaics · Operational
228.9 km

How big is Iwade Solar Farm?

Iwade Solar Farm has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Iwade Solar Farm?

REPD records the operator as FH Dean Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Iwade Solar Farm approved and built?

The application was submitted on 17 January 2013. Permission was granted on 11 July 2013, 6 months later. The site became operational on 19 March 2015, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4836.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode