Mark's Quarry

Mark's Quarry is operational in County Durham with a recorded capacity of 1 MW, and has been generating since 2003-12-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-12-01
Landfill Gas
Technology
Ylem Energy Limited
County Durham
Authority
England

Planning and build timeline

Application submitted2002-07-25
Permission granted2002-11-20
4 months after submission
Operational2003-12-01
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Lumley Water Treatment Works - Solar Panels
Solar Photovoltaics · Operational
1.93.5 km
Sedgeletch Sewage Treatment Works
Solar Photovoltaics · Under Construction
4.5 km
Houghton-le-Spring Landfill Site
Landfill Gas · Operational
35.2 km
Great Eppleton Farm Repowering
Wind Onshore · Operational
8.25.7 km
Great Eppleton Wind Farm
Wind Onshore · Operational
35.7 km
High Haswell Wind Farm
Wind Onshore · Operational
45.9 km
Hawthorn Grid Site - Battery Storage
Battery · Operational
497.6 km
South Sharpley Wind Farm (Revised)
Wind Onshore · Operational
7.57.7 km

How big is Mark's Quarry?

Mark's Quarry has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mark's Quarry?

REPD records the operator as Ylem Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mark's Quarry approved and built?

The application was submitted on 2002-07-25. Permission was granted on 2002-11-20, 4 months later. The site became operational on 2003-12-01, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 649.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council