Great Eppleton Farm Repowering is an operational 8.2 MW onshore wind farm in Sunderland, generating since 1 March 2010. Planning permission was granted on 10 August 2007, 5 months after submission. Operator of record: E.ON UK.

8.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2010
Wind Onshore
Technology
E.ON UK
Sunderland
Authority
England

Planning and build timeline

Application submitted1 March 2007
Permission granted10 August 2007
5 months after submission
Operational1 March 2010
31 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Sunderland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Great Eppleton Farm Repowering’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
30 km
Wind Onshore · Operational
7.52.2 km
Landfill Gas · Operational
32.4 km
Battery · Operational
493.6 km
Wind Onshore · Operational
44.4 km
Solar Photovoltaics · Under Construction
5.2 km
Landfill Gas · Operational
15.7 km
Wind Onshore · Operational
2.65.9 km

How big is Great Eppleton Farm Repowering?

Great Eppleton Farm Repowering has a recorded installed capacity of 8.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Great Eppleton Farm Repowering?

REPD records the operator as E.ON UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Great Eppleton Farm Repowering approved and built?

The application was submitted on 1 March 2007. Permission was granted on 10 August 2007, 5 months later. The site became operational on 1 March 2010, 31 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3504.