Renewable sites › Darlington Road, Skeeby - Battery Energy Storage
Darlington Road, Skeeby - Battery Energy Storage
Darlington Road, Skeeby - Battery Energy Storage is under construction in North Yorkshire with a recorded capacity of 35 MW.
Planning and build timeline
| Application submitted | 2023-06-08 |
| Permission granted | 2023-08-18 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on battery storage
North Yorkshire has decided 29 battery storage schemes and approved 100%, taking a median of 10.5 months. See every battery storage scheme decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Darlington Road, Skeeby Solar Photovoltaics · Operational | 55 | 0.8 km |
Land at Stripe Farm Solar Photovoltaics · Operational | 5 | 1.1 km |
Scorton Landfill Gas · Operational | 1 | 6.8 km |
Land East of Appleton Farm Solar Photovoltaics · Operational | 5 | 7.7 km |
How big is Darlington Road, Skeeby - Battery Energy Storage?
Darlington Road, Skeeby - Battery Energy Storage has a recorded installed capacity of 35 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Darlington Road, Skeeby - Battery Energy Storage?
REPD records the operator as Atrato Onsite Energy / Harmony Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Darlington Road, Skeeby - Battery Energy Storage approved and built?
The application was submitted on 2023-06-08. Permission was granted on 2023-08-18, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14205.
Novarly Parcel · official public data, read properly · parcel.novarly.com