Land West Of Hunger Hill Farm is an operational 5 MW solar farm in Darlington, generating since 15 February 2017. Planning permission was granted on 13 August 2015, 3 months after submission. Operator of record: Greencoat Capital.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 15 February 2017
Solar Photovoltaics
Technology
Greencoat Capital
Darlington
Authority
England

Planning and build timeline

Application submitted19 May 2015
Permission granted13 August 2015
3 months after submission
Operational15 February 2017
18 months after consent

Screening a site of your own?

RedlineUK · £39

Darlington approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land West Of Hunger Hill Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Darlington’s record on solar

Darlington has decided 17 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Darlington

Other built sites within 15 km

SiteMWDistance
Battery · Operational
2.56.5 km
Solar Photovoltaics · Under Construction
49.97.1 km
Solar Photovoltaics · Operational
1.27.4 km
Wind Onshore · Operational
127.6 km
Solar Photovoltaics · Operational
59.2 km
Wind Onshore · Operational
811.2 km
Solar Photovoltaics · Operational
411.7 km
Anaerobic Digestion · Operational
2.812.6 km

How big is Land West Of Hunger Hill Farm?

Land West Of Hunger Hill Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land West Of Hunger Hill Farm?

REPD records the operator as Greencoat Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land West Of Hunger Hill Farm approved and built?

The application was submitted on 19 May 2015. Permission was granted on 13 August 2015, 3 months later. The site became operational on 15 February 2017, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5301.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode