Renewable sitesLongreach STW - extension

Longreach STW - extension

Longreach STW - extension is operational in Dartford with a recorded capacity of 1.1 MW, and has been generating since 2014-07-01.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-07-01
Sewage Sludge Digestion
Technology
Thames Water Utilities
Dartford
Authority
England

Planning and build timeline

Application submitted2012-09-24
Permission granted2012-10-15
1 months after submission
Operational2014-07-01
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Littlebrook Battery Storage
Battery · Operational
7.51.4 km
Rainham Landfill Scheme, Phase I
Landfill Gas · Operational
3.93.8 km
Rainham Phase II
Landfill Gas · Operational
173.8 km
Aveley Landfill Scheme
Landfill Gas · Operational
2.14.2 km
Aveley
Landfill Gas · Operational
1.24.2 km
Sandy Lane Landfill Scheme
Landfill Gas · Operational
2.34.2 km
Medebridge Road - Solar Farm
Solar Photovoltaics · Operational
49.96.4 km
Riverside Sewage Treatment Works Digestion Plant
Sewage Sludge Digestion · Operational
46.4 km

How big is Longreach STW - extension?

Longreach STW - extension has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Longreach STW - extension?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Longreach STW - extension approved and built?

The application was submitted on 2012-09-24. Permission was granted on 2012-10-15, 1 months later. The site became operational on 2014-07-01, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2392.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council