Novarly ParcelRenewable sites

Renewable sitesRiverside Sewage Treatment Works Digestion Plant

Riverside Sewage Treatment Works Digestion Plant

Riverside Sewage Treatment Works Digestion Plant is an operational 4 MW sewage sludge digestion plant in Havering, generating since 30 January 2014. Planning permission was granted on 30 October 2009, 17 months after submission. Operator of record: Thames Water Utilities.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 30 January 2014
Sewage Sludge Digestion
Technology
Thames Water Utilities
Havering
Authority
England

Planning and build timeline

Application submitted2 June 2008
Permission granted30 October 2009
17 months after submission
Operational30 January 2014
51 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Havering: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Riverside Sewage Treatment Works Digestion Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
5.92.4 km
Battery · Under Construction
2.52.5 km
Wind Onshore · Operational
22.8 km
Landfill Gas · Operational
173 km
Landfill Gas · Operational
3.93 km
Anaerobic Digestion · Operational
1.43.4 km
Wind Onshore · Operational
2.53.4 km
Sewage Sludge Digestion · Operational
5.73.4 km

How big is Riverside Sewage Treatment Works Digestion Plant?

Riverside Sewage Treatment Works Digestion Plant has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Riverside Sewage Treatment Works Digestion Plant?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Riverside Sewage Treatment Works Digestion Plant approved and built?

The application was submitted on 2 June 2008. Permission was granted on 30 October 2009, 17 months later. The site became operational on 30 January 2014, 51 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2393.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode