Riverside Sewage Treatment Works Digestion Plant is operational in Havering with a recorded capacity of 4 MW, and has been generating since 2014-01-30.
Planning and build timeline
| Application submitted | 2008-06-02 |
| Permission granted | 2009-10-30 17 months after submission |
| Operational | 2014-01-30 51 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ford Wind Park - Dagenham Wind Onshore · Operational | 5.9 | 2.4 km |
Riverside Resource Recovery Facility Battery Storage Battery · Under Construction | 2.5 | 2.5 km |
Ford Motor Company Ltd (Extension) Wind Onshore · Operational | 2 | 2.8 km |
Rainham Phase II Landfill Gas · Operational | 17 | 3 km |
Rainham Landfill Scheme, Phase I Landfill Gas · Operational | 3.9 | 3 km |
East Dagenham Docks AD (AD) Anaerobic Digestion · Operational | 1.4 | 3.4 km |
Crossness Sewage Works Turbine Wind Onshore · Operational | 2.5 | 3.4 km |
Crossness Sewage Works Sewage Sludge Digestion · Operational | 5.7 | 3.4 km |
How big is Riverside Sewage Treatment Works Digestion Plant?
Riverside Sewage Treatment Works Digestion Plant has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Riverside Sewage Treatment Works Digestion Plant?
REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Riverside Sewage Treatment Works Digestion Plant approved and built?
The application was submitted on 2008-06-02. Permission was granted on 2009-10-30, 17 months later. The site became operational on 2014-01-30, 51 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2393.