Riverside Sewage Treatment Works Digestion Plant

Riverside Sewage Treatment Works Digestion Plant is operational in Havering with a recorded capacity of 4 MW, and has been generating since 2014-01-30.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-01-30
Sewage Sludge Digestion
Technology
Thames Water Utilities
Havering
Authority
England

Planning and build timeline

Application submitted2008-06-02
Permission granted2009-10-30
17 months after submission
Operational2014-01-30
51 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Ford Wind Park - Dagenham
Wind Onshore · Operational
5.92.4 km
Riverside Resource Recovery Facility Battery Storage
Battery · Under Construction
2.52.5 km
Ford Motor Company Ltd (Extension)
Wind Onshore · Operational
22.8 km
Rainham Phase II
Landfill Gas · Operational
173 km
Rainham Landfill Scheme, Phase I
Landfill Gas · Operational
3.93 km
East Dagenham Docks AD (AD)
Anaerobic Digestion · Operational
1.43.4 km
Crossness Sewage Works Turbine
Wind Onshore · Operational
2.53.4 km
Crossness Sewage Works
Sewage Sludge Digestion · Operational
5.73.4 km

How big is Riverside Sewage Treatment Works Digestion Plant?

Riverside Sewage Treatment Works Digestion Plant has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Riverside Sewage Treatment Works Digestion Plant?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Riverside Sewage Treatment Works Digestion Plant approved and built?

The application was submitted on 2008-06-02. Permission was granted on 2009-10-30, 17 months later. The site became operational on 2014-01-30, 51 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2393.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council