Lascar Works

Lascar Works is operational in Bury with a recorded capacity of 20 MW, and has been generating since 2019-06-26.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-06-26
Battery
Technology
Anesco
Bury
Authority
England

Planning and build timeline

Application submitted2017-11-30
Permission granted2018-05-23
6 months after submission
Operational2019-06-26
13 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Pilsworth Landfill Site
Liquid Air Energy Storage · Operational
52.8 km
Pilsworth Quarry Landfill Scheme
Landfill Gas · Operational
4.12.9 km
Chamber House
Solar Photovoltaics · Under Construction
3.995.5 km
Astra Centre, Royal Barn Road - Energy Storage
Battery · Under Construction
407.7 km
Gipsy Lane
Battery · Under Construction
207.7 km
Scout Moor Windfarm
Wind Onshore · Operational
658.2 km
Bolton TRF
EfW Incineration · Operational
10.88.2 km
Clifton Hall
Landfill Gas · Operational
18.6 km

How big is Lascar Works?

Lascar Works has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lascar Works?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lascar Works approved and built?

The application was submitted on 2017-11-30. Permission was granted on 2018-05-23, 6 months later. The site became operational on 2019-06-26, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7464.