Lascar Works
Lascar Works is an operational 20 MW battery storage site in Bury, generating since 26 June 2019. Planning permission was granted on 23 May 2018, 6 months after submission. Operator of record: Anesco.
Planning and build timeline
| Application submitted | 30 November 2017 |
| Permission granted | 23 May 2018 6 months after submission |
| Operational | 26 June 2019 13 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Bury: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Lascar Works’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Liquid Air Energy Storage · Operational | 5 | 2.8 km |
Landfill Gas · Operational | 4.1 | 2.9 km |
Solar Photovoltaics · Under Construction | 3.99 | 5.5 km |
Battery · Under Construction | 40 | 7.7 km |
Battery · Under Construction | 20 | 7.7 km |
Wind Onshore · Operational | 65 | 8.2 km |
EfW Incineration · Operational | 10.8 | 8.2 km |
Landfill Gas · Operational | 1 | 8.6 km |
How big is Lascar Works?
Lascar Works has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lascar Works?
REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lascar Works approved and built?
The application was submitted on 30 November 2017. Permission was granted on 23 May 2018, 6 months later. The site became operational on 26 June 2019, 13 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7464.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode