Rotherdale Farm

Rotherdale Farm is operational in Wychavon with a recorded capacity of 5 MW, and has been generating since 2015-01-01.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-01-01
Solar Photovoltaics
Technology
Vale Green Energy
Wychavon
Authority
England

Planning and build timeline

Application submitted2012-11-13
Permission granted2013-01-04
2 months after submission
Operational2015-01-01
24 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wychavon’s record on solar

Wychavon has decided 34 solar farms and approved 97%, taking a median of 4.4 months. See every solar farm decision in Wychavon

Other built sites within 15 km

SiteMWDistance
Rotherdale Farm - extension
Solar Photovoltaics · Operational
90.9 km
Hill and Moor Landfill Scheme
Landfill Gas · Operational
3.42.4 km
Bishampton Solar Farm
Solar Photovoltaics · Under Construction
303.2 km
Norton Fields Farm
Wind Onshore · Operational
1.36.7 km
Morton Wood Farm
Solar Photovoltaics · Operational
4.86.9 km
Salford Lodge
Solar Photovoltaics · Operational
57.9 km
Bypass Nurseries Solar Farm
Solar Photovoltaics · Operational
3.310.3 km
Croome Airfield Solar Farm
Solar Photovoltaics · Operational
49.910.3 km

How big is Rotherdale Farm?

Rotherdale Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rotherdale Farm?

REPD records the operator as Vale Green Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rotherdale Farm approved and built?

The application was submitted on 2012-11-13. Permission was granted on 2013-01-04, 2 months later. The site became operational on 2015-01-01, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1169.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council