Hyndburn Wind Farm

Hyndburn Wind Farm is operational in Hyndburn with a recorded capacity of 24 MW, and has been generating since 2012-10-19.

24 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-10-19
Wind Onshore
Technology
Energiekontor UK
Hyndburn
Authority
England

Planning and build timeline

Application submitted2009-12-01
Permission granted2010-10-17
11 months after submission
Operational2012-10-19
24 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Balle Street
Battery · Under Construction
6.1 km
Whinney Hill Waste Disposal Site
Landfill Gas · Operational
1.26.1 km
ENWL Training Academy
Solar Photovoltaics · Operational
0.36.3 km
Whinney Hill II Energy
Landfill Gas · Operational
1.86.4 km
Rossendale Power
Landfill Gas · Operational
1.67.1 km
Horncliffe Quarry (Extension)
Landfill Gas · Operational
17.1 km
Horncliffe Quarry
Landfill Gas · Operational
17.1 km
Hameldon Hill extension
Wind Onshore · Operational
7.58.3 km

How big is Hyndburn Wind Farm?

Hyndburn Wind Farm has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hyndburn Wind Farm?

REPD records the operator as Energiekontor UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hyndburn Wind Farm approved and built?

The application was submitted on 2009-12-01. Permission was granted on 2010-10-17, 11 months later. The site became operational on 2012-10-19, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3748.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council