Hyndburn Wind Farm

Hyndburn Wind Farm is an operational 24 MW onshore wind farm in Hyndburn, generating since 19 October 2012. Planning permission was granted on 17 October 2010, 11 months after submission. Operator of record: Energiekontor UK.

24 MW
Capacity
as recorded in REPD
Operational
Status
since 19 October 2012
Wind Onshore
Technology
Energiekontor UK
Hyndburn
Authority
England

Planning and build timeline

Application submitted1 December 2009
Permission granted17 October 2010
11 months after submission
Operational19 October 2012
24 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Hyndburn: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hyndburn Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
6.1 km
Landfill Gas · Operational
1.26.1 km
Solar Photovoltaics · Operational
0.36.3 km
Landfill Gas · Operational
1.86.4 km
Landfill Gas · Operational
1.67.1 km
Landfill Gas · Operational
17.1 km
Landfill Gas · Operational
17.1 km
Wind Onshore · Operational
7.58.3 km

How big is Hyndburn Wind Farm?

Hyndburn Wind Farm has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hyndburn Wind Farm?

REPD records the operator as Energiekontor UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hyndburn Wind Farm approved and built?

The application was submitted on 1 December 2009. Permission was granted on 17 October 2010, 11 months later. The site became operational on 19 October 2012, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3748.