Renewable sites › Horncliffe Quarry
Horncliffe Quarry
Horncliffe Quarry is an operational 1 MW landfill gas site in Rossendale, generating since 1 April 2001. Planning permission was granted on 24 September 2000, 3 months after submission. Operator of record: Natural Power.
Planning and build timeline
| Application submitted | 20 June 2000 |
| Permission granted | 24 September 2000 3 months after submission |
| Operational | 1 April 2001 6 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Rossendale: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Horncliffe Quarry’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 5 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.6 | 0 km |
Landfill Gas · Operational | 1 | 0 km |
Wind Onshore · Operational | 65 | 2.5 km |
Wind Onshore · Operational | 24 | 7.1 km |
Wind Onshore · Operational | 10.2 | 8.6 km |
Landfill Gas · Operational | 2 | 8.9 km |
Wind Onshore · Operational | 12.3 | 9.1 km |
Battery · Operational | 20 | 9.7 km |
How big is Horncliffe Quarry?
Horncliffe Quarry has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Horncliffe Quarry?
REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Horncliffe Quarry approved and built?
The application was submitted on 20 June 2000. Permission was granted on 24 September 2000, 3 months later. The site became operational on 1 April 2001, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 745.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode