Renewable sitesRoosecote

Roosecote

Roosecote is operational in Westmorland and Furness with a recorded capacity of 49 MW, and has been generating since 2018-11-30.

49 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-11-30
Battery
Technology
Centrica
Westmorland and Furness
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2018-11-30

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Westmorland and Furness’s record on battery storage

Westmorland and Furness has decided 7 battery storage schemes and approved 71%, taking a median of 8.8 months. See every battery storage scheme decision in Westmorland and Furness

Other built sites within 15 km

SiteMWDistance
Sowerby Lodge Farm
Solar Photovoltaics · Operational
55 km
Bennett Bank Landfill Site (lfg)
Landfill Gas · Operational
2.26.2 km
Roanhead Farm
Solar Photovoltaics · Operational
6.57.8 km
Askam
Wind Onshore · Operational
4.68.8 km
Harlock Hill Wind Farm
Wind Onshore · Operational
2.511.4 km
Furness Wind Farm/High Winds (Harlock Repowering)
Wind Onshore · Operational
11.511.9 km
Haverigg Extension Wind Farm
Wind Onshore · Operational
2.414.1 km
Haverigg Repowering (Haverigg II)
Wind Onshore · Operational
1.214.1 km

How big is Roosecote?

Roosecote has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Roosecote?

REPD records the operator as Centrica. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Roosecote approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2018-11-30.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6912.

Novarly Parcel · official public data, read properly · parcel.novarly.com