Furness Wind Farm/High Winds (Harlock Repowering)
Furness Wind Farm/High Winds (Harlock Repowering) is operational in Westmorland and Furness with a recorded capacity of 11.5 MW, and has been generating since 2016-11-17.
Planning and build timeline
| Application submitted | 2011-09-06 |
| Permission granted | 2014-07-24 35 months after submission |
| Operational | 2016-11-17 28 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Westmorland and Furness’s record on onshore wind
Westmorland and Furness has decided 17 onshore wind schemes and approved 35%, taking a median of 16.8 months. See every onshore wind scheme decision in Westmorland and Furness →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Harlock Hill Wind Farm Wind Onshore · Operational | 2.5 | 0.5 km |
Askam Wind Onshore · Operational | 4.6 | 3.6 km |
Kirkby Moor Wind Onshore · Operational | 4.8 | 5.4 km |
Roanhead Farm Solar Photovoltaics · Operational | 6.5 | 5.6 km |
Bennett Bank Landfill Site (lfg) Landfill Gas · Operational | 2.2 | 6.6 km |
Sowerby Lodge Farm Solar Photovoltaics · Operational | 5 | 9.9 km |
Haverigg Extension Wind Farm Wind Onshore · Operational | 2.4 | 11.6 km |
Haverigg Repowering (Haverigg II) Wind Onshore · Operational | 1.2 | 11.6 km |
How big is Furness Wind Farm/High Winds (Harlock Repowering)?
Furness Wind Farm/High Winds (Harlock Repowering) has a recorded installed capacity of 11.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Furness Wind Farm/High Winds (Harlock Repowering)?
REPD records the operator as Baywind Co-op & Energy4All & Belltown Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Furness Wind Farm/High Winds (Harlock Repowering) approved and built?
The application was submitted on 2011-09-06. Permission was granted on 2014-07-24, 35 months later. The site became operational on 2016-11-17, 28 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4177.