Bennett Bank Landfill Site (lfg) is an operational 2.2 MW landfill gas site in Westmorland and Furness, generating since 1 October 2005. Planning permission was granted on 28 June 2005, 4 months after submission. Operator of record: Waste Recycling Group.

2.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2005
Landfill Gas
Technology
Waste Recycling Group
Westmorland and Furness
Authority
England

Planning and build timeline

Application submitted4 March 2005
Permission granted28 June 2005
4 months after submission
Operational1 October 2005
3 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Westmorland and Furness: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bennett Bank Landfill Site (lfg)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
6.51.6 km
Wind Onshore · Operational
4.63 km
Solar Photovoltaics · Operational
53.4 km
Battery · Operational
496.2 km
Wind Onshore · Operational
2.56.2 km
Wind Onshore · Operational
11.56.6 km
Wind Onshore · Operational
2.49.3 km
Wind Onshore · Operational
1.29.3 km

How big is Bennett Bank Landfill Site (lfg)?

Bennett Bank Landfill Site (lfg) has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bennett Bank Landfill Site (lfg)?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bennett Bank Landfill Site (lfg) approved and built?

The application was submitted on 4 March 2005. Permission was granted on 28 June 2005, 4 months later. The site became operational on 1 October 2005, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 698.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode