Renewable sites › Bennett Bank Landfill Site (lfg)
Bennett Bank Landfill Site (lfg)
Bennett Bank Landfill Site (lfg) is operational in Westmorland and Furness with a recorded capacity of 2.2 MW, and has been generating since 2005-10-01.
Planning and build timeline
| Application submitted | 2005-03-04 |
| Permission granted | 2005-06-28 4 months after submission |
| Operational | 2005-10-01 3 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Roanhead Farm Solar Photovoltaics · Operational | 6.5 | 1.6 km |
Askam Wind Onshore · Operational | 4.6 | 3 km |
Sowerby Lodge Farm Solar Photovoltaics · Operational | 5 | 3.4 km |
Roosecote Battery · Operational | 49 | 6.2 km |
Harlock Hill Wind Farm Wind Onshore · Operational | 2.5 | 6.2 km |
Furness Wind Farm/High Winds (Harlock Repowering) Wind Onshore · Operational | 11.5 | 6.6 km |
Haverigg Extension Wind Farm Wind Onshore · Operational | 2.4 | 9.3 km |
Haverigg Repowering (Haverigg II) Wind Onshore · Operational | 1.2 | 9.3 km |
How big is Bennett Bank Landfill Site (lfg)?
Bennett Bank Landfill Site (lfg) has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bennett Bank Landfill Site (lfg)?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bennett Bank Landfill Site (lfg) approved and built?
The application was submitted on 2005-03-04. Permission was granted on 2005-06-28, 4 months later. The site became operational on 2005-10-01, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 698.