Haverigg Extension Wind Farm is operational in Cumberland with a recorded capacity of 2.4 MW, and has been generating since 1998-07-01.
Planning and build timeline
| Application submitted | 1991-05-29 |
| Permission granted | 1991-08-08 2 months after submission |
| Operational | 1998-07-01 83 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cumberland’s record on onshore wind
Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Haverigg Repowering (Haverigg II) Wind Onshore · Operational | 1.2 | 0 km |
Roanhead Farm Solar Photovoltaics · Operational | 6.5 | 8.2 km |
Sowerby Lodge Farm Solar Photovoltaics · Operational | 5 | 9.1 km |
Bennett Bank Landfill Site (lfg) Landfill Gas · Operational | 2.2 | 9.3 km |
Askam Wind Onshore · Operational | 4.6 | 9.6 km |
Furness Wind Farm/High Winds (Harlock Repowering) Wind Onshore · Operational | 11.5 | 11.6 km |
Harlock Hill Wind Farm Wind Onshore · Operational | 2.5 | 11.6 km |
Kirkby Moor Wind Onshore · Operational | 4.8 | 13.7 km |
How big is Haverigg Extension Wind Farm?
Haverigg Extension Wind Farm has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Haverigg Extension Wind Farm?
REPD records the operator as The Wind Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Haverigg Extension Wind Farm approved and built?
The application was submitted on 1991-05-29. Permission was granted on 1991-08-08, 2 months later. The site became operational on 1998-07-01, 83 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2626.