Haverigg Extension Wind Farm is an operational 2.4 MW onshore wind farm in Cumberland, generating since 1 July 1998. Planning permission was granted on 8 August 1991, 2 months after submission. Operator of record: The Wind Company.

2.4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 July 1998
Wind Onshore
Technology
The Wind Company
Cumberland
Authority
England

Planning and build timeline

Application submitted29 May 1991
Permission granted8 August 1991
2 months after submission
Operational1 July 1998
83 months after consent

Screening a site of your own?

RedlineUK · £39

Cumberland approves 66% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Haverigg Extension Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on onshore wind

Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
1.20 km
Solar Photovoltaics · Operational
6.58.2 km
Solar Photovoltaics · Operational
59.1 km
Landfill Gas · Operational
2.29.3 km
Wind Onshore · Operational
4.69.6 km
Wind Onshore · Operational
11.511.6 km
Wind Onshore · Operational
2.511.6 km
Wind Onshore · Operational
4.813.7 km

How big is Haverigg Extension Wind Farm?

Haverigg Extension Wind Farm has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Haverigg Extension Wind Farm?

REPD records the operator as The Wind Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Haverigg Extension Wind Farm approved and built?

The application was submitted on 29 May 1991. Permission was granted on 8 August 1991, 2 months later. The site became operational on 1 July 1998, 83 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2626.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode