Renewable sitesRoanhead Farm

Roanhead Farm

Roanhead Farm is operational in Westmorland and Furness with a recorded capacity of 6.5 MW, and has been generating since 2015-03-21.

6.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-21
Solar Photovoltaics
Technology
Fengate Capital
Westmorland and Furness
Authority
England

Planning and build timeline

Application submitted2014-07-07
Permission granted2014-09-25
3 months after submission
Operational2015-03-21
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Westmorland and Furness’s record on solar

Westmorland and Furness has decided 39 solar farms and approved 85%, taking a median of 3.8 months. See every solar farm decision in Westmorland and Furness

Other built sites within 15 km

SiteMWDistance
Bennett Bank Landfill Site (lfg)
Landfill Gas · Operational
2.21.6 km
Askam
Wind Onshore · Operational
4.62.1 km
Sowerby Lodge Farm
Solar Photovoltaics · Operational
54.4 km
Harlock Hill Wind Farm
Wind Onshore · Operational
2.55.3 km
Furness Wind Farm/High Winds (Harlock Repowering)
Wind Onshore · Operational
11.55.6 km
Roosecote
Battery · Operational
497.8 km
Haverigg Repowering (Haverigg II)
Wind Onshore · Operational
1.28.2 km
Haverigg Extension Wind Farm
Wind Onshore · Operational
2.48.2 km

How big is Roanhead Farm?

Roanhead Farm has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Roanhead Farm?

REPD records the operator as Fengate Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Roanhead Farm approved and built?

The application was submitted on 2014-07-07. Permission was granted on 2014-09-25, 3 months later. The site became operational on 2015-03-21, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2021.