Renewable sites › Rookery Farm
Rookery Farm
Rookery Farm is an operational 3.8 MW solar farm in Arun, generating since 30 March 2015. Planning permission was granted on 29 May 2014, 3 months after submission. Operator of record: Green Switch Solutions.
Planning and build timeline
| Application submitted | 7 March 2014 |
| Permission granted | 29 May 2014 3 months after submission |
| Operational | 30 March 2015 10 months after consent |
Screening a site of your own?
Arun approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Rookery Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Arun’s record on solar
Arun has decided 10 solar farms and approved 100%, taking a median of 3.2 months. See every solar farm decision in Arun →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 14.5 | 1.2 km |
Solar Photovoltaics · Operational | 1 | 2.7 km |
Solar Photovoltaics · Operational | 5 | 3.3 km |
Solar Photovoltaics · Operational | 0.2 | 3.4 km |
Solar Photovoltaics · Operational | 5 | 4.3 km |
Landfill Gas · Operational | 1.4 | 4.5 km |
Solar Photovoltaics · Operational | 6 | 5.5 km |
Solar Photovoltaics · Operational | 3 | 5.7 km |
How big is Rookery Farm?
Rookery Farm has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rookery Farm?
REPD records the operator as Green Switch Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rookery Farm approved and built?
The application was submitted on 7 March 2014. Permission was granted on 29 May 2014, 3 months later. The site became operational on 30 March 2015, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1785.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode