Rookery Farm is operational in Arun with a recorded capacity of 3.8 MW, and has been generating since 2015-03-30.

3.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-30
Solar Photovoltaics
Technology
Green Switch Solutions
Arun
Authority
England

Planning and build timeline

Application submitted2014-03-07
Permission granted2014-05-29
3 months after submission
Operational2015-03-30
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Arun’s record on solar

Arun has decided 10 solar farms and approved 100%, taking a median of 3.2 months. See every solar farm decision in Arun

Other built sites within 15 km

SiteMWDistance
Bilsham Farm
Solar Photovoltaics · Operational
14.51.2 km
Land at Barnham
Solar Photovoltaics · Operational
12.7 km
Binsted Farm
Solar Photovoltaics · Operational
53.3 km
Tesco Superstore Shripney Road
Solar Photovoltaics · Operational
0.23.4 km
Manor Farm - Shripney
Solar Photovoltaics · Operational
54.3 km
Lidsey Landfill
Landfill Gas · Operational
1.44.5 km
Decoy Farm House Solar Modules
Solar Photovoltaics · Operational
65.5 km
Land at Brookbarn Farm
Solar Photovoltaics · Operational
35.7 km

How big is Rookery Farm?

Rookery Farm has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rookery Farm?

REPD records the operator as Green Switch Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rookery Farm approved and built?

The application was submitted on 2014-03-07. Permission was granted on 2014-05-29, 3 months later. The site became operational on 2015-03-30, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1785.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council