Manor Farm - Shripney is operational in Arun with a recorded capacity of 5 MW, and has been generating since 2016-03-07.
Planning and build timeline
| Application submitted | 2014-06-05 |
| Permission granted | 2014-08-12 2 months after submission |
| Operational | 2016-03-07 19 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Arun’s record on solar
Arun has decided 10 solar farms and approved 100%, taking a median of 3.2 months. See every solar farm decision in Arun →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lidsey Landfill Landfill Gas · Operational | 1.4 | 0.9 km |
Decoy Farm House Solar Modules Solar Photovoltaics · Operational | 6 | 1.7 km |
Tesco Superstore Shripney Road Solar Photovoltaics · Operational | 0.2 | 2.2 km |
Land at Barnham Solar Photovoltaics · Operational | 1 | 2.4 km |
Park Farm Solar Photovoltaics · Operational | 5 | 2.6 km |
Oving Solar Farm Solar Photovoltaics · Operational | 5 | 3 km |
Bilsham Farm Solar Photovoltaics · Operational | 14.5 | 3.3 km |
Merston Solar Park Solar Photovoltaics · Operational | 10 | 3.5 km |
How big is Manor Farm - Shripney?
Manor Farm - Shripney has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Manor Farm - Shripney?
REPD records the operator as BNRG Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Manor Farm - Shripney approved and built?
The application was submitted on 2014-06-05. Permission was granted on 2014-08-12, 2 months later. The site became operational on 2016-03-07, 19 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2296.