Renewable sites › Tesco Superstore Shripney Road
Tesco Superstore Shripney Road
Tesco Superstore Shripney Road is operational in Arun with a recorded capacity of 0.2 MW, and has been generating since 2020-05-01.
Planning and build timeline
| Application submitted | 2019-03-11 |
| Permission granted | 2021-03-11 24 months after submission |
| Operational | 2020-05-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Arun’s record on solar
Arun has decided 10 solar farms and approved 100%, taking a median of 3.2 months. See every solar farm decision in Arun →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Manor Farm - Shripney Solar Photovoltaics · Operational | 5 | 2.2 km |
Lidsey Landfill Landfill Gas · Operational | 1.4 | 3 km |
Bilsham Farm Solar Photovoltaics · Operational | 14.5 | 3.1 km |
Land at Barnham Solar Photovoltaics · Operational | 1 | 3.1 km |
Rookery Farm Solar Photovoltaics · Operational | 3.8 | 3.4 km |
Park Farm Solar Photovoltaics · Operational | 5 | 3.5 km |
Decoy Farm House Solar Modules Solar Photovoltaics · Operational | 6 | 3.9 km |
Sefter Farm AD Plant (Farm AD) Anaerobic Digestion · Operational | 1 | 4.8 km |
How big is Tesco Superstore Shripney Road?
Tesco Superstore Shripney Road has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tesco Superstore Shripney Road?
REPD records the operator as Batchelor Electrical. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tesco Superstore Shripney Road approved and built?
The application was submitted on 2019-03-11. Permission was granted on 2021-03-11, 24 months later. The site became operational on 2020-05-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7229.