Decoy Farm House Solar Modules is operational in Chichester with a recorded capacity of 6 MW, and has been generating since 2014-03-31.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-31
Solar Photovoltaics
Technology
Ms Power Projects Ltd
Chichester
Authority
England

Planning and build timeline

Application submitted2012-05-17
Permission granted2012-10-17
5 months after submission
Operational2014-03-31
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Chichester’s record on solar

Chichester has decided 24 solar farms and approved 88%, taking a median of 2.6 months. See every solar farm decision in Chichester

Other built sites within 15 km

SiteMWDistance
Lidsey Landfill
Landfill Gas · Operational
1.41.1 km
Oving Solar Farm
Solar Photovoltaics · Operational
51.3 km
Manor Farm - Shripney
Solar Photovoltaics · Operational
51.7 km
Land at Tangmere Airfield
Solar Photovoltaics · Operational
52.2 km
Land at Barnham
Solar Photovoltaics · Operational
13 km
Merston Solar Park
Solar Photovoltaics · Operational
103.1 km
Park Farm
Solar Photovoltaics · Operational
53.1 km
Tesco Superstore Shripney Road
Solar Photovoltaics · Operational
0.23.9 km

How big is Decoy Farm House Solar Modules?

Decoy Farm House Solar Modules has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Decoy Farm House Solar Modules?

REPD records the operator as Ms Power Projects Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Decoy Farm House Solar Modules approved and built?

The application was submitted on 2012-05-17. Permission was granted on 2012-10-17, 5 months later. The site became operational on 2014-03-31, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1987.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council