Renewable sites › Decoy Farm House Solar Modules
Decoy Farm House Solar Modules
Decoy Farm House Solar Modules is operational in Chichester with a recorded capacity of 6 MW, and has been generating since 2014-03-31.
Planning and build timeline
| Application submitted | 2012-05-17 |
| Permission granted | 2012-10-17 5 months after submission |
| Operational | 2014-03-31 17 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Chichester’s record on solar
Chichester has decided 24 solar farms and approved 88%, taking a median of 2.6 months. See every solar farm decision in Chichester →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lidsey Landfill Landfill Gas · Operational | 1.4 | 1.1 km |
Oving Solar Farm Solar Photovoltaics · Operational | 5 | 1.3 km |
Manor Farm - Shripney Solar Photovoltaics · Operational | 5 | 1.7 km |
Land at Tangmere Airfield Solar Photovoltaics · Operational | 5 | 2.2 km |
Land at Barnham Solar Photovoltaics · Operational | 1 | 3 km |
Merston Solar Park Solar Photovoltaics · Operational | 10 | 3.1 km |
Park Farm Solar Photovoltaics · Operational | 5 | 3.1 km |
Tesco Superstore Shripney Road Solar Photovoltaics · Operational | 0.2 | 3.9 km |
How big is Decoy Farm House Solar Modules?
Decoy Farm House Solar Modules has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Decoy Farm House Solar Modules?
REPD records the operator as Ms Power Projects Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Decoy Farm House Solar Modules approved and built?
The application was submitted on 2012-05-17. Permission was granted on 2012-10-17, 5 months later. The site became operational on 2014-03-31, 17 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1987.
Novarly Parcel · official public data, read properly · parcel.novarly.com