Riverside Resource Recovery Facility (RRRF)

Riverside Resource Recovery Facility (RRRF) is an operational 72 MW energy-from-waste plant in Bexley, generating since 1 September 2011. Planning permission was granted on 15 June 2006, 81 months after submission. Operator of record: Cory Environmental.

72 MW
Capacity
as recorded in REPD
Operational
Status
since 1 September 2011
EfW Incineration
Technology
Cory Environmental
Bexley
Authority
England

Planning and build timeline

Application submitted29 September 1999
Permission granted15 June 2006
81 months after submission
Operational1 September 2011
63 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Bexley: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Riverside Resource Recovery Facility (RRRF)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Sewage Sludge Digestion · Operational
5.74.1 km
Wind Onshore · Operational
2.54.1 km
Solar Photovoltaics · Operational
0.624.3 km
Solar Photovoltaics · Operational
1.54.6 km
Battery · Under Construction
2.54.8 km
Biomass (dedicated) · Operational
85.8 km
Landfill Gas · Operational
175.8 km
Landfill Gas · Operational
3.95.8 km

How big is Riverside Resource Recovery Facility (RRRF)?

Riverside Resource Recovery Facility (RRRF) has a recorded installed capacity of 72 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Riverside Resource Recovery Facility (RRRF)?

REPD records the operator as Cory Environmental. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Riverside Resource Recovery Facility (RRRF) approved and built?

The application was submitted on 29 September 1999. Permission was granted on 15 June 2006, 81 months later. The site became operational on 1 September 2011, 63 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 859.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode