Renewable sites › Rise Carr, Darlington / CLNR EES3-1
Rise Carr, Darlington / CLNR EES3-1
Rise Carr, Darlington / CLNR EES3-1 is operational in Darlington with a recorded capacity of 2.5 MW, and has been generating since 2014-06-05.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2014-06-05 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — Teesmouth and Cleveland Coast SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Aldi Distribution Centre - Darlington Solar Photovoltaics · Operational | 1.2 | 1 km |
Burtree Lane - Solar farm Solar Photovoltaics · Under Construction | 49.9 | 1.1 km |
Moor House Wind Farm Wind Onshore · Operational | 12 | 5.1 km |
Land West Of Hunger Hill Farm Solar Photovoltaics · Operational | 5 | 6.5 km |
Preston Road AD Plant (Waste AD) Anaerobic Digestion · Operational | 2.8 | 6.8 km |
Field at School Aycliffe Lane Solar Photovoltaics · Operational | 5 | 7.3 km |
PG2 Bolam Power Generator (Extension) Landfill Gas · Operational | 1.1 | 11.4 km |
PG2 Bolam Power Generation Landfill Gas · Operational | 1 | 11.4 km |
How big is Rise Carr, Darlington / CLNR EES3-1?
Rise Carr, Darlington / CLNR EES3-1 has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rise Carr, Darlington / CLNR EES3-1?
REPD records the operator as Northern Powergrid. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rise Carr, Darlington / CLNR EES3-1 approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2014-06-05.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6856.