Novarly ParcelRenewable sites

Renewable sitesRise Carr, Darlington / CLNR EES3-1

Rise Carr, Darlington / CLNR EES3-1

Rise Carr, Darlington / CLNR EES3-1 is operational in Darlington with a recorded capacity of 2.5 MW, and has been generating since 2014-06-05.

2.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-06-05
Battery
Technology
Northern Powergrid
Darlington
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2014-06-05

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Aldi Distribution Centre - Darlington
Solar Photovoltaics · Operational
1.21 km
Burtree Lane - Solar farm
Solar Photovoltaics · Under Construction
49.91.1 km
Moor House Wind Farm
Wind Onshore · Operational
125.1 km
Land West Of Hunger Hill Farm
Solar Photovoltaics · Operational
56.5 km
Preston Road AD Plant (Waste AD)
Anaerobic Digestion · Operational
2.86.8 km
Field at School Aycliffe Lane
Solar Photovoltaics · Operational
57.3 km
PG2 Bolam Power Generator (Extension)
Landfill Gas · Operational
1.111.4 km
PG2 Bolam Power Generation
Landfill Gas · Operational
111.4 km

How big is Rise Carr, Darlington / CLNR EES3-1?

Rise Carr, Darlington / CLNR EES3-1 has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rise Carr, Darlington / CLNR EES3-1?

REPD records the operator as Northern Powergrid. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rise Carr, Darlington / CLNR EES3-1 approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2014-06-05.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6856.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council