Renewable sites › PG2 Bolam Power Generation
PG2 Bolam Power Generation
PG2 Bolam Power Generation is operational in County Durham with a recorded capacity of 1 MW, and has been generating since 2002-08-15.
Planning and build timeline
| Application submitted | 1999-05-08 |
| Permission granted | 1999-05-25 1 months after submission |
| Operational | 2002-08-15 39 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
PG2 Bolam Power Generator (Extension) Landfill Gas · Operational | 1.1 | 0 km |
Field at School Aycliffe Lane Solar Photovoltaics · Operational | 5 | 7.1 km |
Preston Road AD Plant (Waste AD) Anaerobic Digestion · Operational | 2.8 | 8.1 km |
Aldi Distribution Centre - Darlington Solar Photovoltaics · Operational | 1.2 | 10.5 km |
Burtree Lane - Solar farm Solar Photovoltaics · Under Construction | 49.9 | 10.8 km |
Rise Carr, Darlington / CLNR EES3-1 Battery · Operational | 2.5 | 11.4 km |
Chilton Energy Plant Biomass (dedicated) · Operational | 18 | 11.6 km |
Moor House Wind Farm Wind Onshore · Operational | 12 | 13.8 km |
How big is PG2 Bolam Power Generation?
PG2 Bolam Power Generation has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates PG2 Bolam Power Generation?
REPD records the operator as CLP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was PG2 Bolam Power Generation approved and built?
The application was submitted on 1999-05-08. Permission was granted on 1999-05-25, 1 months later. The site became operational on 2002-08-15, 39 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 564.