Novarly ParcelRenewable sites

Renewable sitesPreston Road AD Plant (Waste AD)

Preston Road AD Plant (Waste AD)

Preston Road AD Plant (Waste AD) is an operational 2.8 MW anaerobic digestion plant in County Durham, generating since 28 October 2013. Planning permission was granted on 6 July 2012, 27 months after submission. Operator of record: Emerald Biogas.

2.8 MW
Capacity
as recorded in REPD
Operational
Status
since 28 October 2013
Anaerobic Digestion
Technology
Emerald Biogas
County Durham
Authority
England

Planning and build timeline

Application submitted29 March 2010
Permission granted6 July 2012
27 months after submission
Operational28 October 2013
16 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in County Durham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Preston Road AD Plant (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
51.1 km
Wind Onshore · Operational
126.4 km
Solar Photovoltaics · Operational
1.26.4 km
Battery · Operational
2.56.8 km
Solar Photovoltaics · Under Construction
49.97 km
Biomass (dedicated) · Operational
187 km
Landfill Gas · Operational
18.1 km
Landfill Gas · Operational
1.18.1 km

How big is Preston Road AD Plant (Waste AD)?

Preston Road AD Plant (Waste AD) has a recorded installed capacity of 2.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Preston Road AD Plant (Waste AD)?

REPD records the operator as Emerald Biogas. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Preston Road AD Plant (Waste AD) approved and built?

The application was submitted on 29 March 2010. Permission was granted on 6 July 2012, 27 months later. The site became operational on 28 October 2013, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 280.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode