Preston Road AD Plant (Waste AD) is operational in County Durham with a recorded capacity of 2.8 MW, and has been generating since 2013-10-28.

2.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-10-28
Anaerobic Digestion
Technology
Emerald Biogas
County Durham
Authority
England

Planning and build timeline

Application submitted2010-03-29
Permission granted2012-07-06
27 months after submission
Operational2013-10-28
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Field at School Aycliffe Lane
Solar Photovoltaics · Operational
51.1 km
Moor House Wind Farm
Wind Onshore · Operational
126.4 km
Aldi Distribution Centre - Darlington
Solar Photovoltaics · Operational
1.26.4 km
Rise Carr, Darlington / CLNR EES3-1
Battery · Operational
2.56.8 km
Burtree Lane - Solar farm
Solar Photovoltaics · Under Construction
49.97 km
Chilton Energy Plant
Biomass (dedicated) · Operational
187 km
PG2 Bolam Power Generation
Landfill Gas · Operational
18.1 km
PG2 Bolam Power Generator (Extension)
Landfill Gas · Operational
1.18.1 km

How big is Preston Road AD Plant (Waste AD)?

Preston Road AD Plant (Waste AD) has a recorded installed capacity of 2.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Preston Road AD Plant (Waste AD)?

REPD records the operator as Emerald Biogas. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Preston Road AD Plant (Waste AD) approved and built?

The application was submitted on 2010-03-29. Permission was granted on 2012-07-06, 27 months later. The site became operational on 2013-10-28, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 280.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council