Hammond Court Farm
Hammond Court Farm is operational in South Gloucestershire with a recorded capacity of 15 MW, and has been generating since 2015-03-31.
Planning and build timeline
| Application submitted | 2014-07-25 |
| Permission granted | 2015-02-12 7 months after submission |
| Operational | 2015-03-31 2 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — South Gloucestershire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Gloucestershire’s record on solar
South Gloucestershire has decided 54 solar farms and approved 96%, taking a median of 1.8 months. See every solar farm decision in South Gloucestershire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Grange Farm (Avon) Solar Photovoltaics · Operational | 21 | 0.6 km |
Amcor Flexibles Solar Photovoltaics · Operational | 1.7 | 1.9 km |
Parklands Solar Photovoltaics · Operational | 4.6 | 2.5 km |
Perrinpit Farm Solar Photovoltaics · Under Construction | 49.9 | 2.5 km |
Rolls Royce Filton Campus Building 185 Solar Photovoltaics · Operational | 1.8 | 3.2 km |
Rolls Royce Filton Campus Building 184 Solar Photovoltaics · Operational | 1.4 | 3.2 km |
Oakham Farm Solar Photovoltaics · Operational | 8 | 3.4 km |
Alveston Wind Park Wind Onshore · Operational | 6.9 | 4.3 km |
How big is Hammond Court Farm?
Hammond Court Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hammond Court Farm?
REPD records the operator as Solar Power South. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hammond Court Farm approved and built?
The application was submitted on 2014-07-25. Permission was granted on 2015-02-12, 7 months later. The site became operational on 2015-03-31, 2 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1992.