Larks Green Solar Farm is operational in South Gloucestershire with a recorded capacity of 49.5 MW, and has been generating since 2024-11-12.

49.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-11-12
Battery
Technology
Enso Energy / Iron Acton Green
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted2020-08-21
Permission granted2021-01-05
5 months after submission
Operational2024-11-12
46 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Gloucestershire’s record on battery storage

South Gloucestershire has decided 15 battery storage schemes and approved 93%, taking a median of 8.3 months. See every battery storage scheme decision in South Gloucestershire

Other built sites within 15 km

SiteMWDistance
Larks Green Solar Farm
Solar Photovoltaics · Operational
700 km
Alveston Wind Park
Wind Onshore · Operational
6.91.7 km
Tower Hill Farm
Solar Photovoltaics · Operational
8.12.2 km
Perrinpit Farm
Solar Photovoltaics · Under Construction
49.93.9 km
Grange Farm (Avon)
Solar Photovoltaics · Operational
215.3 km
Says Court Farm solar park
Solar Photovoltaics · Operational
19.85.3 km
Parklands
Solar Photovoltaics · Operational
4.65.6 km
Hammond Court Farm
Solar Photovoltaics · Operational
155.7 km

How big is Larks Green Solar Farm?

Larks Green Solar Farm has a recorded installed capacity of 49.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Larks Green Solar Farm?

REPD records the operator as Enso Energy / Iron Acton Green. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Larks Green Solar Farm approved and built?

The application was submitted on 2020-08-21. Permission was granted on 2021-01-05, 5 months later. The site became operational on 2024-11-12, 46 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8052.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council