Novarly ParcelRenewable sites

Renewable sitesPerrinpit Farm

Perrinpit Farm

Perrinpit Farm is under construction in South Gloucestershire with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Grune Energien
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted2021-03-12
Permission granted2022-09-21
18 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Gloucestershire’s record on solar

South Gloucestershire has decided 54 solar farms and approved 96%, taking a median of 1.8 months. See every solar farm decision in South Gloucestershire

Other built sites within 15 km

SiteMWDistance
Grange Farm (Avon)
Solar Photovoltaics · Operational
211.9 km
Hammond Court Farm
Solar Photovoltaics · Operational
152.5 km
Alveston Wind Park
Wind Onshore · Operational
6.93 km
Amcor Flexibles
Solar Photovoltaics · Operational
1.73.3 km
Says Court Farm solar park
Solar Photovoltaics · Operational
19.83.5 km
Larks Green Solar Farm
Solar Photovoltaics · Operational
703.9 km
Larks Green Solar Farm
Battery · Operational
49.53.9 km
Parklands
Solar Photovoltaics · Operational
4.64.1 km

How big is Perrinpit Farm?

Perrinpit Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Perrinpit Farm?

REPD records the operator as Grune Energien. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Perrinpit Farm approved and built?

The application was submitted on 2021-03-12. Permission was granted on 2022-09-21, 18 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7944.