Withnell LFS

Withnell LFS is operational in Chorley with a recorded capacity of 2.3 MW, and has been generating since 1996-01-01.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1996-01-01
Landfill Gas
Technology
Unknown
Chorley
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1996-01-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Balle Street
Battery · Under Construction
4.4 km
BAE Samlesbury Aerodrome
Solar Photovoltaics · Operational
26.9 km
ENWL Training Academy
Solar Photovoltaics · Operational
0.38 km
Land at Fell View Farm (Phase 1)
Solar Photovoltaics · Operational
4.210.1 km
Fell View Farm (Phase 2)
Solar Photovoltaics · Operational
2.910.2 km
Hyndburn Wind Farm
Wind Onshore · Operational
2410.5 km
The Glowhouse
Battery · Under Construction
511.5 km
Rigby Landfill
Landfill Gas · Operational
312.2 km

How big is Withnell LFS?

Withnell LFS has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Withnell LFS?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Withnell LFS approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1996-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 635.