Rhodders Wind Farm

Rhodders Wind Farm is operational in Clackmannanshire with a recorded capacity of 12 MW, and has been generating since 2016-02-29.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-02-29
Wind Onshore
Technology
EDF/Wind Prospect
Clackmannanshire
Authority
Scotland

Planning and build timeline

Application submitted2011-11-07
Permission granted2014-01-21
26 months after submission
Operational2016-02-29
25 months after consent

Other built sites within 15 km

SiteMWDistance
Burnfoot Hill
Wind Onshore · Operational
260.8 km
Burnfoot East Wind Farm (further extension)
Wind Onshore · Operational
10.81.5 km
Burnfoot Hill Extension
Wind Onshore · Operational
41.5 km
Balhearty Solar
Solar Photovoltaics · Operational
58.1 km
Devilla Energy Storage Facility
Battery · Under Construction
5008.1 km
Green Knowes
Wind Onshore · Operational
278.8 km
Gleneagles Hotel Biomass Boiler Plant Room
Biomass (dedicated) · Operational
1.29 km
Strathallan Wind Farm
Wind Onshore · Under Construction
20.713.5 km

How big is Rhodders Wind Farm?

Rhodders Wind Farm has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rhodders Wind Farm?

REPD records the operator as EDF/Wind Prospect. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rhodders Wind Farm approved and built?

The application was submitted on 2011-11-07. Permission was granted on 2014-01-21, 26 months later. The site became operational on 2016-02-29, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4223.