Strathallan Wind Farm is a 20.7 MW onshore wind farm under construction in Perth and Kinross. Planning permission was granted on 15 January 2019, 39 months after submission. Operator of record: Green Cat Renewables.
Planning and build timeline
| Application submitted | 12 October 2015 |
| Permission granted | 15 January 2019 39 months after submission |
| Operational | not recorded |
Screening a site of your own?
Perth and Kinross approves 48% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Strathallan Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Perth and Kinross’s record on onshore wind
Perth and Kinross has decided 27 onshore wind schemes and approved 48%, taking a median of 15.2 months. See every onshore wind scheme decision in Perth and Kinross →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 72 | 8.9 km |
Small Hydro · Operational | 3 | 9.8 km |
Small Hydro · Operational | 1.9 | 10 km |
Biomass (dedicated) · Operational | 1.2 | 10.7 km |
Small Hydro · Operational | 4 | 11.2 km |
Wind Onshore · Operational | 4 | 13.2 km |
Wind Onshore · Operational | 26 | 13.5 km |
Wind Onshore · Operational | 12 | 13.5 km |
How big is Strathallan Wind Farm?
Strathallan Wind Farm has a recorded installed capacity of 20.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Strathallan Wind Farm?
REPD records the operator as Green Cat Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Strathallan Wind Farm approved and built?
The application was submitted on 12 October 2015. Permission was granted on 15 January 2019, 39 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2860.