Renewable sites › Strathallan Wind Farm
Strathallan Wind Farm
Strathallan Wind Farm is under construction in Perth and Kinross with a recorded capacity of 20.7 MW.
Planning and build timeline
| Application submitted | 2015-10-12 |
| Permission granted | 2019-01-15 39 months after submission |
| Operational | not recorded |
Perth and Kinross’s record on onshore wind
Perth and Kinross has decided 27 onshore wind schemes and approved 48%, taking a median of 15.2 months. See every onshore wind scheme decision in Perth and Kinross →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Braes O'Doune Wind Onshore · Operational | 72 | 8.9 km |
Lednock Small Hydro · Operational | 3 | 9.8 km |
Turret water treatment works Small Hydro · Operational | 1.9 | 10 km |
Gleneagles Hotel Biomass Boiler Plant Room Biomass (dedicated) · Operational | 1.2 | 10.7 km |
Dalchonzie Small Hydro · Operational | 4 | 11.2 km |
Burnfoot Hill Extension Wind Onshore · Operational | 4 | 13.2 km |
Burnfoot Hill Wind Onshore · Operational | 26 | 13.5 km |
Rhodders Wind Farm Wind Onshore · Operational | 12 | 13.5 km |
How big is Strathallan Wind Farm?
Strathallan Wind Farm has a recorded installed capacity of 20.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Strathallan Wind Farm?
REPD records the operator as Green Cat Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Strathallan Wind Farm approved and built?
The application was submitted on 2015-10-12. Permission was granted on 2019-01-15, 39 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2860.
Novarly Parcel · official public data, read properly · parcel.novarly.com