Gleneagles Hotel Biomass Boiler Plant Room is an operational 1.2 MW biomass plant in Perth and Kinross, generating since 1 October 2021. Planning permission was granted on 4 February 2021, 3 months after submission. Operator of record: AMP Energy Services Limited.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2021
Biomass (dedicated)
Technology
AMP Energy Services Limited
Perth and Kinross
Authority
Scotland

Planning and build timeline

Application submitted19 November 2020
Permission granted4 February 2021
3 months after submission
Operational1 October 2021
8 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Perth and Kinross: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Gleneagles Hotel Biomass Boiler Plant Room’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
276.5 km
Wind Onshore · Operational
47.6 km
Wind Onshore · Operational
10.88.3 km
Wind Onshore · Operational
268.4 km
Wind Onshore · Operational
129 km
Wind Onshore · Under Construction
20.710.7 km
Small Hydro · Operational
1.911.3 km

How big is Gleneagles Hotel Biomass Boiler Plant Room?

Gleneagles Hotel Biomass Boiler Plant Room has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gleneagles Hotel Biomass Boiler Plant Room?

REPD records the operator as AMP Energy Services Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gleneagles Hotel Biomass Boiler Plant Room approved and built?

The application was submitted on 19 November 2020. Permission was granted on 4 February 2021, 3 months later. The site became operational on 1 October 2021, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8188.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode