Ramsey Wind Farm Extension
Ramsey Wind Farm Extension is an operational 8 MW onshore wind farm in Huntingdonshire, generating since 23 April 2015. Planning permission was granted on 22 May 2013, 18 months after submission. Operator of record: REG Windpower.
Planning and build timeline
| Application submitted | 8 November 2011 |
| Permission granted | 22 May 2013 18 months after submission |
| Operational | 23 April 2015 23 months after consent |
Screening a site of your own?
Huntingdonshire approves 80% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Ramsey Wind Farm Extension’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Huntingdonshire’s record on onshore wind
Huntingdonshire has decided 10 onshore wind schemes and approved 80%, taking a median of 13.9 months. See every onshore wind scheme decision in Huntingdonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 2.1 km |
Wind Onshore · Operational | 1.8 | 2.6 km |
Solar Photovoltaics · Operational | 5 | 2.7 km |
Wind Onshore · Operational | 16 | 5.7 km |
Wind Onshore · Operational | 12 | 5.7 km |
Wind Onshore · Operational | 24 | 7.6 km |
Solar Photovoltaics · Operational | 2.7 | 9.2 km |
Solar Photovoltaics · Operational | 4.7 | 9.4 km |
How big is Ramsey Wind Farm Extension?
Ramsey Wind Farm Extension has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ramsey Wind Farm Extension?
REPD records the operator as REG Windpower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ramsey Wind Farm Extension approved and built?
The application was submitted on 8 November 2011. Permission was granted on 22 May 2013, 18 months later. The site became operational on 23 April 2015, 23 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4414.