Bury Green Farm Solar

Bury Green Farm Solar is an operational 5 MW solar farm in Huntingdonshire, generating since 15 March 2016. Planning permission was granted on 25 September 2015, 4 months after submission. Operator of record: Bury Green Farm Solar (Caledon Partners).

5 MW
Capacity
as recorded in REPD
Operational
Status
since 15 March 2016
Solar Photovoltaics
Technology
Bury Green Farm Solar (Caledon Partners)
Huntingdonshire
Authority
England

Planning and build timeline

Application submitted18 May 2015
Permission granted25 September 2015
4 months after submission
Operational15 March 2016
6 months after consent

Screening a site of your own?

RedlineUK · £39

Huntingdonshire approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bury Green Farm Solar’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Huntingdonshire’s record on solar

Huntingdonshire has decided 33 solar farms and approved 97%, taking a median of 3.2 months. See every solar farm decision in Huntingdonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
50.8 km
Wind Onshore · Operational
82.1 km
Wind Onshore · Operational
1.82.1 km
Solar Photovoltaics · Operational
97.7 km
Wind Onshore · Operational
247.7 km
Wind Onshore · Operational
127.7 km
Wind Onshore · Operational
167.7 km
Solar Photovoltaics · Operational
2.49 km

How big is Bury Green Farm Solar?

Bury Green Farm Solar has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bury Green Farm Solar?

REPD records the operator as Bury Green Farm Solar (Caledon Partners). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bury Green Farm Solar approved and built?

The application was submitted on 18 May 2015. Permission was granted on 25 September 2015, 4 months later. The site became operational on 15 March 2016, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6180.