Novarly ParcelRenewable sites

Renewable sitesTurves/Burtnhouse Solar Farm Extension

Turves/Burtnhouse Solar Farm Extension

Turves/Burtnhouse Solar Farm Extension is an operational 4.7 MW solar farm in Fenland, generating since 21 January 2015. Planning permission was granted on 24 July 2014, 3 months after submission. Operator of record: Lightsource Renewable Energy.

4.7 MW
Capacity
as recorded in REPD
Operational
Status
since 21 January 2015
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Fenland
Authority
England

Planning and build timeline

Application submitted25 April 2014
Permission granted24 July 2014
3 months after submission
Operational21 January 2015
6 months after consent

Screening a site of your own?

RedlineUK · £39

Fenland approves 91% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Turves/Burtnhouse Solar Farm Extension’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Fenland’s record on solar

Fenland has decided 22 solar farms and approved 91%, taking a median of 2.8 months. See every solar farm decision in Fenland

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
50.1 km
Wind Onshore · Operational
61 km
Wind Onshore · Operational
1.51.8 km
Wind Onshore · Operational
64.3 km
Wind Onshore · Operational
44.8 km
Wind Onshore · Operational
165.7 km
Wind Onshore · Operational
125.7 km
Wind Onshore · Operational
10.35.9 km

How big is Turves/Burtnhouse Solar Farm Extension?

Turves/Burtnhouse Solar Farm Extension has a recorded installed capacity of 4.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Turves/Burtnhouse Solar Farm Extension?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Turves/Burtnhouse Solar Farm Extension approved and built?

The application was submitted on 25 April 2014. Permission was granted on 24 July 2014, 3 months later. The site became operational on 21 January 2015, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2171.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode