Novarly ParcelRenewable sites

Renewable sitesChilton Energy Plant

Chilton Energy Plant

Chilton Energy Plant is operational in County Durham with a recorded capacity of 18 MW, and has been generating since 2012-03-12.

18 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-03-12
Biomass (dedicated)
Technology
Dalkia
County Durham
Authority
England

Planning and build timeline

Application submitted2008-09-17
Permission granted2009-11-24
14 months after submission
Operational2012-03-12
28 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Preston Road AD Plant (Waste AD)
Anaerobic Digestion · Operational
2.87 km
Field at School Aycliffe Lane
Solar Photovoltaics · Operational
57 km
PG1-Coxhoe Waste Disposal Site
Landfill Gas · Operational
3.87.9 km
Trimdon Grange
Wind Onshore · Operational
5.29.9 km
Southern Law
Wind Onshore · Operational
5.210.4 km
Butterwick Moor
Wind Onshore · Operational
20.511 km
Walkway
Wind Onshore · Operational
1411 km
Moor House Wind Farm
Wind Onshore · Operational
1211.3 km

How big is Chilton Energy Plant?

Chilton Energy Plant has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chilton Energy Plant?

REPD records the operator as Dalkia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chilton Energy Plant approved and built?

The application was submitted on 2008-09-17. Permission was granted on 2009-11-24, 14 months later. The site became operational on 2012-03-12, 28 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14.