Renewable sitesMMD Shipping Services

MMD Shipping Services

MMD Shipping Services is operational in Portsmouth with a recorded capacity of 1.2 MW, and has been generating since 2015-03-09.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-09
Solar Photovoltaics
Technology
EvoEnergy
Portsmouth
Authority
England

Planning and build timeline

Application submitted2014-07-04
Permission granted2014-09-12
2 months after submission
Operational2015-03-09
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Portsmouth’s record on solar

Portsmouth has decided 17 solar farms and approved 94%, taking a median of 1.7 months. See every solar farm decision in Portsmouth

Other built sites within 15 km

SiteMWDistance
Portsmouth International Port - Solar Panels
Solar Photovoltaics · Under Construction
1.20.2 km
Portsmouth ERF
EfW Incineration · Operational
142.8 km
Paulsgrove Landfill Site
Landfill Gas · Operational
2.42.9 km
Lakeside Business Park
Battery · Under Construction
23.4 km
Lakeside Business Park
Solar Photovoltaics · Under Construction
4.53.4 km
Newlands Farm Battery Storage Facility Phase 2
Battery · Operational
407.6 km
Newlands Farm Solar
Solar Photovoltaics · Operational
20.57.8 km
Southwick Estate
Solar Photovoltaics · Operational
488.3 km

How big is MMD Shipping Services?

MMD Shipping Services has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates MMD Shipping Services?

REPD records the operator as EvoEnergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was MMD Shipping Services approved and built?

The application was submitted on 2014-07-04. Permission was granted on 2014-09-12, 2 months later. The site became operational on 2015-03-09, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5071.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council