Renewable sites › Plot 2B EurolinkV
Plot 2B EurolinkV
Plot 2B EurolinkV is under construction in Swale with a recorded capacity of 20 MW.
Planning and build timeline
| Application submitted | 2019-05-03 |
| Permission granted | 2019-07-25 3 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Swale’s record on battery storage
Swale has decided 6 battery storage schemes and approved 100%, taking a median of 6.1 months. See every battery storage scheme decision in Swale →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tonge Corner Farm Solar Photovoltaics · Operational | 22 | 1.3 km |
K3 CHP Facility (Kemsley EfW) EfW Incineration · Operational | 49.9 | 2.4 km |
Kemsley Substation Battery · Operational | 49.9 | 2.9 km |
Morrisons roof mounted solar Solar Photovoltaics · Operational | 2 | 3.3 km |
Ridham CHP Plant Biomass (dedicated) · Operational | 25 | 4.1 km |
Orchard Farm Solar Photovoltaics · Operational | 10 | 5.6 km |
Bobbing solar farm Solar Photovoltaics · Operational | 11.3 | 5.8 km |
South Lees Farm Solar Photovoltaics · Operational | 11 | 6.7 km |
How big is Plot 2B EurolinkV?
Plot 2B EurolinkV has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Plot 2B EurolinkV?
REPD records the operator as Trenport Investments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Plot 2B EurolinkV approved and built?
The application was submitted on 2019-05-03. Permission was granted on 2019-07-25, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7383.