Renewable sites › K3 CHP Facility (Kemsley EfW)
K3 CHP Facility (Kemsley EfW)
K3 CHP Facility (Kemsley EfW) is an operational 49.9 MW energy-from-waste plant in Swale, generating since 21 July 2020. Planning permission was granted on 13 July 2010, 4 months after submission. Operator of record: E.ON / Wheelabrator Technologies.
Planning and build timeline
| Application submitted | 23 March 2010 |
| Permission granted | 13 July 2010 4 months after submission |
| Operational | 21 July 2020 120 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Swale: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with K3 CHP Facility (Kemsley EfW)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 2 | 1.1 km |
Battery · Operational | 49.9 | 1.1 km |
Biomass (dedicated) · Operational | 25 | 1.7 km |
Solar Photovoltaics · Operational | 22 | 2 km |
Battery · Under Construction | 20 | 2.4 km |
Solar Photovoltaics · Operational | 10 | 4.2 km |
Battery · Under Construction | 40 | 4.7 km |
Solar Photovoltaics · Operational | 11.3 | 5 km |
How big is K3 CHP Facility (Kemsley EfW)?
K3 CHP Facility (Kemsley EfW) has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates K3 CHP Facility (Kemsley EfW)?
REPD records the operator as E.ON / Wheelabrator Technologies. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was K3 CHP Facility (Kemsley EfW) approved and built?
The application was submitted on 23 March 2010. Permission was granted on 13 July 2010, 4 months later. The site became operational on 21 July 2020, 120 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 946.