Novarly ParcelRenewable sites

Renewable sitesPen y Cymoedd Energy Storage

Pen y Cymoedd Energy Storage

Pen y Cymoedd Energy Storage is an operational 22 MW battery storage site in Neath Port Talbot, generating since 1 May 2018. REPD does not record the planning grant date. Operator of record: Vattenfall.

22 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2018
Battery
Technology
Vattenfall
Neath Port Talbot
Authority
Wales

Planning and build timeline

Application submitted19 November 2009
Permission grantednot recorded
Operational1 May 2018

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Neath Port Talbot: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Pen y Cymoedd Energy Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2280 km
Wind Onshore · Operational
245.3 km
Wind Onshore · Operational
325.6 km
Wind Onshore · Operational
65.8 km
Solar Photovoltaics · Operational
57.8 km
Wind Onshore · Operational
88.8 km
Wind Onshore · Operational
269.3 km
Landfill Gas · Operational
29.5 km

How big is Pen y Cymoedd Energy Storage?

Pen y Cymoedd Energy Storage has a recorded installed capacity of 22 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pen y Cymoedd Energy Storage?

REPD records the operator as Vattenfall. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pen y Cymoedd Energy Storage approved and built?

The application was submitted on 19 November 2009. REPD does not record a grant date. The site became operational on 1 May 2018.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6927.