Planning and build timeline
| Application submitted | 2010-11-15 |
| Permission granted | 2013-08-27 33 months after submission |
| Operational | 2017-09-14 49 months after consent |
Neath Port Talbot’s record on onshore wind
Neath Port Talbot has decided 20 onshore wind schemes and approved 70%, taking a median of 24.6 months. See every onshore wind scheme decision in Neath Port Talbot →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Llynfi Afan Renewable Energy Park Wind Onshore · Operational | 6 | 0.5 km |
Ffynnon Oer Wind Farm Wind Onshore · Operational | 32 | 4.3 km |
Pen Y Cymoedd Wind Onshore · Operational | 228 | 5.3 km |
Pen y Cymoedd Energy Storage Battery · Operational | 22 | 5.3 km |
Pant y wal Wind Onshore · Operational | 25 | 8.8 km |
Maerdy Wind Onshore · Operational | 24 | 9.2 km |
Pant y wal extension Wind Onshore · Operational | 20 | 9.4 km |
Fforch Nest Wind Farm pt1 Wind Onshore · Operational | 10 | 9.5 km |
How big is Llynfi Renewable Energy Park, Land at Mynydd Caerau?
Llynfi Renewable Energy Park, Land at Mynydd Caerau has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Llynfi Renewable Energy Park, Land at Mynydd Caerau?
REPD records the operator as John Laing Environmental Assets Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Llynfi Renewable Energy Park, Land at Mynydd Caerau approved and built?
The application was submitted on 2010-11-15. Permission was granted on 2013-08-27, 33 months later. The site became operational on 2017-09-14, 49 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4656.