Renewable sitesBriton Ferry

Briton Ferry

Briton Ferry is an operational 2 MW landfill gas site in Neath Port Talbot, generating since 1 September 2004. Planning permission was granted on 5 June 1996, 2 months after submission. Operator of record: Neath Port Talbot Waste Management Co Ltd.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 September 2004
Landfill Gas
Technology
Neath Port Talbot Waste Management Co Ltd
Neath Port Talbot
Authority
Wales

Planning and build timeline

Application submitted18 April 1996
Permission granted5 June 1996
2 months after submission
Operational1 September 2004
99 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Neath Port Talbot: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Briton Ferry’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.20.1 km
Solar Photovoltaics · Operational
53.7 km
Hydrogen · Under Construction
2.53.8 km
Solar Photovoltaics · Operational
0.24.2 km
Solar Photovoltaics · Operational
105.6 km
Solar Photovoltaics · Under Construction
55.6 km
Solar Photovoltaics · Operational
56.6 km
Wind Onshore · Operational
88.8 km

How big is Briton Ferry?

Briton Ferry has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Briton Ferry?

REPD records the operator as Neath Port Talbot Waste Management Co Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Briton Ferry approved and built?

The application was submitted on 18 April 1996. Permission was granted on 5 June 1996, 2 months later. The site became operational on 1 September 2004, 99 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 602.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode