Renewable sites › Aldi Distribution Centre
Aldi Distribution Centre
Aldi Distribution Centre is operational in West Lothian with a recorded capacity of 1.3 MW, and has been generating since 2015-10-22.
Planning and build timeline
| Application submitted | 2015-02-10 |
| Permission granted | 2015-03-04 1 months after submission |
| Operational | 2015-10-22 8 months after consent |
West Lothian’s record on solar
West Lothian has decided 16 solar farms and approved 94%, taking a median of 2.2 months. See every solar farm decision in West Lothian →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Southrigg Wind Onshore · Operational | 1.5 | 5.2 km |
Torrance Farm Wind Park Extension Wind Onshore · Operational | 5.7 | 6.1 km |
Torrance Farm Wind Onshore · Operational | 9 | 6.2 km |
Pates Hill Wind Onshore · Operational | 14 | 7.3 km |
Longhill Burn Wind Farm Wind Onshore · Under Construction | 45.6 | 7.4 km |
Tormywheel Wind Onshore · Operational | 30.75 | 8.4 km |
Pearie Law Wind Farm Wind Onshore · Operational | 19.2 | 8.4 km |
Drumduff Wind Onshore · Operational | 8.5 | 8.7 km |
How big is Aldi Distribution Centre?
Aldi Distribution Centre has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Aldi Distribution Centre?
REPD records the operator as Aldi. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Aldi Distribution Centre approved and built?
The application was submitted on 2015-02-10. Permission was granted on 2015-03-04, 1 months later. The site became operational on 2015-10-22, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5012.