Renewable sites › Oxcroft Solar Farm
Oxcroft Solar Farm
Oxcroft Solar Farm is an operational 1 MW battery storage site in Bolsover, generating since 1 December 2017. REPD does not record the planning grant date. Operator of record: Anesco.
Planning and build timeline
| Application submitted | 30 March 2016 |
| Permission granted | not recorded |
| Operational | 1 December 2017 |
Screening a site of your own?
Bolsover approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Oxcroft Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bolsover’s record on battery storage
Bolsover has decided 6 battery storage schemes and approved 100%, taking a median of 1.9 months. See every battery storage scheme decision in Bolsover →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 3 | 0 km |
Solar Photovoltaics · Operational | 4 | 1 km |
Solar Photovoltaics · Operational | 31 | 3 km |
Battery · Operational | — | 3 km |
Solar Photovoltaics · Operational | 5 | 3.3 km |
Solar Photovoltaics · Operational | 8 | 3.8 km |
Solar Photovoltaics · Operational | 5 | 4.1 km |
Landfill Gas · Operational | 2.1 | 4.9 km |
How big is Oxcroft Solar Farm?
Oxcroft Solar Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Oxcroft Solar Farm?
REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Oxcroft Solar Farm approved and built?
The application was submitted on 30 March 2016. REPD does not record a grant date. The site became operational on 1 December 2017.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6885.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode