Renewable sites › Oxcroft Solar Farm
Oxcroft Solar Farm
Oxcroft Solar Farm is operational in Bolsover with a recorded capacity of 1 MW, and has been generating since 2017-12-01.
Planning and build timeline
| Application submitted | 2016-03-30 |
| Permission granted | not recorded |
| Operational | 2017-12-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bolsover’s record on battery storage
Bolsover has decided 6 battery storage schemes and approved 100%, taking a median of 1.9 months. See every battery storage scheme decision in Bolsover →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land at Oxcroft Stocking Ground Solar Photovoltaics · Operational | 3 | 0 km |
Land at Oxcroft Stocking Ground Solar Photovoltaics · Operational | 4 | 1 km |
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage Solar Photovoltaics · Operational | 31 | 3 km |
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage Battery · Operational | — | 3 km |
Land at Bolsover Moor Quarry Solar Photovoltaics · Operational | 5 | 3.3 km |
Arkwright Solar Farm Solar Photovoltaics · Operational | 8 | 3.8 km |
Cherry Tree Farm Solar Photovoltaics · Operational | 5 | 4.1 km |
Staveley Power Landfill Gas · Operational | 2.1 | 4.9 km |
How big is Oxcroft Solar Farm?
Oxcroft Solar Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Oxcroft Solar Farm?
REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Oxcroft Solar Farm approved and built?
The application was submitted on 2016-03-30. REPD does not record a grant date. The site became operational on 2017-12-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6885.