Staveley Power

Staveley Power is an operational 2.1 MW landfill gas site in Chesterfield, generating since 1 April 2005. Planning permission was granted on 28 April 2003, 3 months after submission. Operator of record: Waste Recycling Group.

2.1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 April 2005
Landfill Gas
Technology
Waste Recycling Group
Chesterfield
Authority
England

Planning and build timeline

Application submitted20 January 2003
Permission granted28 April 2003
3 months after submission
Operational1 April 2005
23 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Chesterfield: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Staveley Power’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
50.8 km
Solar Photovoltaics · Operational
312.3 km
Battery · Operational
2.3 km
Solar Photovoltaics · Operational
83.1 km
Solar Photovoltaics · Operational
43.9 km
Solar Photovoltaics · Operational
54.3 km
Solar Photovoltaics · Operational
34.9 km
Battery · Operational
14.9 km

How big is Staveley Power?

Staveley Power has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Staveley Power?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Staveley Power approved and built?

The application was submitted on 20 January 2003. Permission was granted on 28 April 2003, 3 months later. The site became operational on 1 April 2005, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 765.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode