Renewable sites › Staveley Power
Staveley Power
Staveley Power is operational in Chesterfield with a recorded capacity of 2.1 MW, and has been generating since 2005-04-01.
Planning and build timeline
| Application submitted | 2003-01-20 |
| Permission granted | 2003-04-28 3 months after submission |
| Operational | 2005-04-01 23 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Chesterfield
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
The Breck Solar Photovoltaics · Operational | 5 | 0.8 km |
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage Solar Photovoltaics · Operational | 31 | 2.3 km |
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage Battery · Operational | — | 2.3 km |
Arkwright Solar Farm Solar Photovoltaics · Operational | 8 | 3.1 km |
Land at Oxcroft Stocking Ground Solar Photovoltaics · Operational | 4 | 3.9 km |
Cherry Tree Farm Solar Photovoltaics · Operational | 5 | 4.3 km |
Land at Oxcroft Stocking Ground Solar Photovoltaics · Operational | 3 | 4.9 km |
Oxcroft Solar Farm Battery · Operational | 1 | 4.9 km |
How big is Staveley Power?
Staveley Power has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Staveley Power?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Staveley Power approved and built?
The application was submitted on 2003-01-20. Permission was granted on 2003-04-28, 3 months later. The site became operational on 2005-04-01, 23 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 765.