Novarly ParcelRenewable sites

Renewable sitesStaveley Power

Staveley Power

Staveley Power is operational in Chesterfield with a recorded capacity of 2.1 MW, and has been generating since 2005-04-01.

2.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2005-04-01
Landfill Gas
Technology
Waste Recycling Group
Chesterfield
Authority
England

Planning and build timeline

Application submitted2003-01-20
Permission granted2003-04-28
3 months after submission
Operational2005-04-01
23 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
The Breck
Solar Photovoltaics · Operational
50.8 km
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage
Solar Photovoltaics · Operational
312.3 km
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage
Battery · Operational
2.3 km
Arkwright Solar Farm
Solar Photovoltaics · Operational
83.1 km
Land at Oxcroft Stocking Ground
Solar Photovoltaics · Operational
43.9 km
Cherry Tree Farm
Solar Photovoltaics · Operational
54.3 km
Land at Oxcroft Stocking Ground
Solar Photovoltaics · Operational
34.9 km
Oxcroft Solar Farm
Battery · Operational
14.9 km

How big is Staveley Power?

Staveley Power has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Staveley Power?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Staveley Power approved and built?

The application was submitted on 2003-01-20. Permission was granted on 2003-04-28, 3 months later. The site became operational on 2005-04-01, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 765.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council