Arkwright Solar Farm is operational in Chesterfield with a recorded capacity of 8 MW, and has been generating since 2015-12-18.

8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-18
Solar Photovoltaics
Technology
Conergy
Chesterfield
Authority
England

Planning and build timeline

Application submitted2014-09-15
Permission granted2015-02-24
5 months after submission
Operational2015-12-18
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Chesterfield’s record on solar

Chesterfield has decided 10 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Chesterfield

Other built sites within 15 km

SiteMWDistance
Cherry Tree Farm
Solar Photovoltaics · Operational
51.2 km
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage
Solar Photovoltaics · Operational
311.3 km
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage
Battery · Operational
1.3 km
Land To The East Of Back Lane
Solar Photovoltaics · Operational
53 km
Staveley Power
Landfill Gas · Operational
2.13.1 km
Land at Oxcroft Stocking Ground
Solar Photovoltaics · Operational
43.3 km
Calow Green Farm
Battery · Operational
203.5 km
Oxcroft Solar Farm
Battery · Operational
13.8 km

How big is Arkwright Solar Farm?

Arkwright Solar Farm has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Arkwright Solar Farm?

REPD records the operator as Conergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Arkwright Solar Farm approved and built?

The application was submitted on 2014-09-15. Permission was granted on 2015-02-24, 5 months later. The site became operational on 2015-12-18, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2107.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council