Novarly ParcelRenewable sites

Renewable sitesLand at Oxcroft Stocking Ground

Land at Oxcroft Stocking Ground

Land at Oxcroft Stocking Ground is an operational 4 MW solar farm in Chesterfield, generating since 25 March 2016. Planning permission was granted on 8 December 2015, 5 months after submission. Operator of record: Anesco.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 25 March 2016
Solar Photovoltaics
Technology
Anesco
Chesterfield
Authority
England

Planning and build timeline

Application submitted22 July 2015
Permission granted8 December 2015
5 months after submission
Operational25 March 2016
4 months after consent

Screening a site of your own?

RedlineUK · £39

Chesterfield approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land at Oxcroft Stocking Ground’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Chesterfield’s record on solar

Chesterfield has decided 10 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Chesterfield

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
31 km
Battery · Operational
11 km
Battery · Operational
2.3 km
Solar Photovoltaics · Operational
312.3 km
Solar Photovoltaics · Operational
83.3 km
Solar Photovoltaics · Operational
53.9 km
Landfill Gas · Operational
2.13.9 km
Solar Photovoltaics · Operational
54.3 km

How big is Land at Oxcroft Stocking Ground?

Land at Oxcroft Stocking Ground has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Oxcroft Stocking Ground?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Oxcroft Stocking Ground approved and built?

The application was submitted on 22 July 2015. Permission was granted on 8 December 2015, 5 months later. The site became operational on 25 March 2016, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5383.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode