Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage is operational in Chesterfield.
Planning and build timeline
| Application submitted | 2020-07-20 |
| Permission granted | 2021-04-20 9 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage Solar Photovoltaics · Operational | 31 | 0 km |
Arkwright Solar Farm Solar Photovoltaics · Operational | 8 | 1.3 km |
Land at Oxcroft Stocking Ground Solar Photovoltaics · Operational | 4 | 2.3 km |
Staveley Power Landfill Gas · Operational | 2.1 | 2.3 km |
Cherry Tree Farm Solar Photovoltaics · Operational | 5 | 2.4 km |
Land at Oxcroft Stocking Ground Solar Photovoltaics · Operational | 3 | 3 km |
Oxcroft Solar Farm Battery · Operational | 1 | 3 km |
The Breck Solar Photovoltaics · Operational | 5 | 3 km |
How big is Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage?
REPD does not record an installed capacity for Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage.
Who operates Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage?
REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage approved and built?
The application was submitted on 2020-07-20. Permission was granted on 2021-04-20, 9 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12301.