Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage is an operational 31 MW solar farm in Chesterfield. Planning permission was granted on 20 April 2021, 9 months after submission. Operator of record: Low Carbon.
Planning and build timeline
| Application submitted | 20 July 2020 |
| Permission granted | 20 April 2021 9 months after submission |
| Operational | not recorded |
Screening a site of your own?
Chesterfield approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Chesterfield’s record on solar
Chesterfield has decided 10 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Chesterfield →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Operational | — | 0 km |
Solar Photovoltaics · Operational | 8 | 1.3 km |
Solar Photovoltaics · Operational | 4 | 2.3 km |
Landfill Gas · Operational | 2.1 | 2.3 km |
Solar Photovoltaics · Operational | 5 | 2.4 km |
Solar Photovoltaics · Operational | 3 | 3 km |
Battery · Operational | 1 | 3 km |
Solar Photovoltaics · Operational | 5 | 3 km |
How big is Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage?
Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage has a recorded installed capacity of 31 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage?
REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage approved and built?
The application was submitted on 20 July 2020. Permission was granted on 20 April 2021, 9 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12300.
Novarly Parcel · official public data, read properly · parcel.novarly.com