Novarly ParcelRenewable sites

Renewable sitesOrchard End

Orchard End

Orchard End is operational in Wyre with a recorded capacity of 4 MW, and has been generating since 2013-06-17.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-06-17
Wind Onshore
Technology
Renewable Energy Generation
Wyre
Authority
England

Planning and build timeline

Application submitted2009-05-12
Permission granted2010-12-16
19 months after submission
Operational2013-06-17
30 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Dewlay Cheese Wind Turbine
Wind Onshore · Operational
25.4 km
Westfield Farm
Solar Photovoltaics · Operational
57.3 km
Thornton Power Station
Biomass (dedicated) · Operational
98.9 km
Bilsborrow Solar Farm
Solar Photovoltaics · Operational
59.2 km
Thornton Waste Recovery Park (Waste AD)
Anaerobic Digestion · Operational
1.99.8 km
Jameson Road
Landfill Gas · Operational
4.39.9 km
Weeton Barracks, Grantham Road - Solar Panels
Solar Photovoltaics · Under Construction
0.710.1 km
Fleetwood Water Treatment Works
Solar Photovoltaics · Operational
1.310.1 km

How big is Orchard End?

Orchard End has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Orchard End?

REPD records the operator as Renewable Energy Generation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Orchard End approved and built?

The application was submitted on 2009-05-12. Permission was granted on 2010-12-16, 19 months later. The site became operational on 2013-06-17, 30 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3703.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council