Orchard End is an operational 4 MW onshore wind farm in Wyre, generating since 17 June 2013. Planning permission was granted on 16 December 2010, 19 months after submission. Operator of record: Renewable Energy Generation.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 17 June 2013
Wind Onshore
Technology
Renewable Energy Generation
Wyre
Authority
England

Planning and build timeline

Application submitted12 May 2009
Permission granted16 December 2010
19 months after submission
Operational17 June 2013
30 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Wyre: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Orchard End’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
25.4 km
Solar Photovoltaics · Operational
57.3 km
Biomass (dedicated) · Operational
98.9 km
Solar Photovoltaics · Operational
59.2 km
Anaerobic Digestion · Operational
1.99.8 km
Landfill Gas · Operational
4.39.9 km
Solar Photovoltaics · Under Construction
0.710.1 km
Solar Photovoltaics · Operational
1.310.1 km

How big is Orchard End?

Orchard End has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Orchard End?

REPD records the operator as Renewable Energy Generation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Orchard End approved and built?

The application was submitted on 12 May 2009. Permission was granted on 16 December 2010, 19 months later. The site became operational on 17 June 2013, 30 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3703.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode