Thornton Power Station is an operational 9 MW biomass plant in Wyre, generating since 15 June 2002. REPD does not record the planning grant date. Operator of record: TPS (UK).
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 15 June 2002 |
Screening a site of your own?
Redline runs the record on your own boundary in Wyre: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Thornton Power Station’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1.9 | 1.8 km |
Landfill Gas · Operational | 4.3 | 2.7 km |
Solar Photovoltaics · Operational | 1.3 | 3.3 km |
Solar Photovoltaics · Operational | 4.5 | 6.9 km |
Solar Photovoltaics · Under Construction | 0.7 | 7.6 km |
Wind Onshore · Operational | 4 | 8.9 km |
Solar Photovoltaics · Operational | 4.9 | 11.6 km |
Solar Photovoltaics · Operational | 5 | 12.7 km |
How big is Thornton Power Station?
Thornton Power Station has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Thornton Power Station?
REPD records the operator as TPS (UK). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Thornton Power Station approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 15 June 2002.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 44.