Novarly ParcelRenewable sites

Renewable sitesThornton Power Station

Thornton Power Station

Thornton Power Station is operational in Wyre with a recorded capacity of 9 MW, and has been generating since 2002-06-15.

9 MW
Capacity
as recorded in REPD
Operational
Status
since 2002-06-15
Biomass (dedicated)
Technology
TPS (UK)
Wyre
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2002-06-15

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Thornton Waste Recovery Park (Waste AD)
Anaerobic Digestion · Operational
1.91.8 km
Jameson Road
Landfill Gas · Operational
4.32.7 km
Fleetwood Water Treatment Works
Solar Photovoltaics · Operational
1.33.3 km
Land To The South Of Todderstaffe
Solar Photovoltaics · Operational
4.56.9 km
Weeton Barracks, Grantham Road - Solar Panels
Solar Photovoltaics · Under Construction
0.77.6 km
Orchard End
Wind Onshore · Operational
48.9 km
Staining Wood Farm
Solar Photovoltaics · Operational
4.911.6 km
Land off Moss Side Lane
Solar Photovoltaics · Operational
512.7 km

How big is Thornton Power Station?

Thornton Power Station has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Thornton Power Station?

REPD records the operator as TPS (UK). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Thornton Power Station approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2002-06-15.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 44.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council